FAA
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.
1A Certification
Includes Mandatory Field Visit
Certified GPS land survey in accordance with FAA guidelines (+20 ft. horizontally, +3 ft. vertically) to determine the latitude and longitude of the tower or structure along with the elevation/AGL height of the tower, structure, or installed/proposed antennas.
48-72 hours after the on-site visit is complete.
2C Certification
Includes Mandatory Field Visit
Certified GPS land survey in accordance with FAA guidelines (+50 ft. horizontally, +20 ft. vertically) to determine the latitude and longitude of the tower or structure along with the elevation/AGL height of the tower, structure, or installed/proposed antennas.
48-72 hours after the on-site visit is complete.
2C Certification
Desktop Study
No Field Visit.
Desktop study to perform a GPS land survey in accordance with FAA guidelines (+50 ft. horizontally, +20 ft. vertically) to determine the latitude and longitude of the tower or structure along with the elevation/AGL height of the tower, structure, or installed/proposed antennas .
Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact.
48-72 hours.
Airspace Study
Does NOT Include FAA Form 7460-1 Filing
Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact with public, private, and/or DOB runway(s)/airspace.
48-72 hours
Airspace Study
Includes FAA Form 7460-1 Filing
Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact with public, private, and/or DOB runway(s)/airspace.
Online submission and filing of FAA Form 7460-1
48-72 hours.
The ASR Registration Search enables you to search for a wide range of licenses in the Antenna Structure Registration system. The ‘Search for a Registration” enables you to search on basic elements of registration, including registration number, FAA study number, FRN, and licensee name. The “Search by Location” enables you to look up a registration based on the location and height of a structure. You can also use the advanced search to perform more sophisticated searches based on numerous criteria.
FAA Form
7460-1 Filing
Notice of Proposed Construction or Alteration.
Online submission and filing of FAA Form 7460-1 in accordance with FAA regulations.
48-72 hours.
FAA Form
7460-2 Filing
Supplemental Notice of Construction or Alteration.
This information is collected to process obstruction data that is critical to flight safety and is not confidential.
Online submission and filing of FAA Form 7460-2 in accordance with FAA regulations.
48-72 hours.
FAA Form
7460-2 (Part 1) Filing
Online submission and filing of FAA Form 7460-2 (Part 1) in accordance with FAA regulations.
48-72 hours.
FAA Form
7460-2 (Part 2) Filing
Online submission and filing of FAA Form 7460-2 (Part 2) in accordance with FAA regulations.
48-72 hours.
FAA Form
854 Filing
FCC Application for Antenna Structure Registration.
Online submission and filing of FCC Form 7460-1 in accordance with FCC regulations.
48-72 hours.
Special Conditions:
Client to provide all relevant site information including, but not limited to, lat/long, tower height, existing/proposed tower, etc. to complete respective services at the time the PO is issued to insure the Delivery Time expectation is met.