SERVING TELECOM SINCE 1996

FAA

Certifications & Studies

1A Certification

Includes Mandatory Field Visit

Certified GPS land survey in accordance with FAA guidelines (+20 ft. horizontally, +3 ft. vertically) to determine the latitude and longitude of the tower or structure, along with the elevation/AGL height of the tower, structure, or installed/proposed antennas.

48-72 hours after the on-site visit is complete.

2C Certification

Includes Mandatory Field Visit

Certified GPS land survey in accordance with FAA guidelines (+50 ft. horizontally, +20 ft. vertically) to determine the latitude and longitude of the tower or structure, along with the elevation/AGL height of the tower, structure, or installed/proposed antennas.

48-72 hours after the on-site visit is complete.

2C Certification

Desktop Study

No Field Visit.
Desktop study to perform a GPS land survey in accordance with FAA guidelines (+50 ft. horizontally, +20 ft. vertically) to determine the latitude and longitude of the tower or structure, along with the elevation/AGL height of the tower, structure, or installed/proposed antennas.
Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact.

48-72 hours.

Airspace Study

Does Not Include FAA Form 7460-1 Filing

Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact with public, private, and/or DOB runway(s)/airspace.

48-72 hours.

Airspace Study

Includes FAA Form 7460-1 Filing

Delivery of a professional opinion letter and a conical map showing radius clearances and/or areas of concern/impact with public, private, and/or DOB runway(s)/airspace.

Online Submission And Filing Of FAA Form 7460-1

48-72 hours.

The ASR Registration Search enables you to search for a wide range of licenses in the Antenna Structure Registration system. The ‘Search for a Registration” enables you to search on basic elements of registration, including registration number, FAA study number, FRN, and licensee name. The “Search by Location” enables you to look up a registration based on the location and height of a structure. You can also use the advanced search to perform more sophisticated searches based on numerous criteria.

Forms

FAA FORM

7460-1 Filing

  • Notice of Proposed Construction or Alteration.
  • Online submission and filing of FAA Form 7460-1 in accordance with FAA regulations.

48-72 hours.

 

FAA FORM

7460-2 Filing

  • Supplemental Notice of Construction or Alteration.
  • This information is collected to process obstruction data that is critical to flight safety and is not confidential.
  • Online submission and filing of FAA Form 7460-2 in accordance with FAA regulations.

48-72 hours.

 

FAA FORM

7460-2 (Part 1) Filing

Online submission and filing of FAA Form 7460-2 (Part 1) in accordance with FAA regulations.

48-72 hours.

 

FAA FORM

7460-2 (Part 2) Filing

Online submission and filing of FAA Form 7460-2 (Part 2) in accordance with FAA regulations.

48-72 hours.

 

FAA FORM

854 Filing

  • FCC Application for Antenna Structure Registration.
  • Online submission and filing of FCC Form 7460-1 in accordance with FCC regulations.

48-72 hours.

 

Special Conditions:

Client to provide all relevant site information, including, but not limited to, lat/long, tower height, existing/proposed tower, etc., to complete respective services at the time the PO is issued to ensure the Delivery Time expectation is met.

The M1R2 Difference

Servicing Telecom Since 1996

Three decades of disciplined execution.

Woman-Owned and Operated

Certified woman-owned business in 2026.

Single-Source Accountability

One integrated, accountable partner.

Ready to Build the Future of Connectivity?

If it connects, communicates, or carries data - M1R2 designs it, builds it, manages it, and delivers it.